Nrr nrc. The NRC is familiar with reviewing ERs using the standard format and, while the NRC could review an ER that is in a different format, the standard format adds efficiencies to the NRC review. Nrr nrc

 
 The NRC is familiar with reviewing ERs using the standard format and, while the NRC could review an ER that is in a different format, the standard format adds efficiencies to the NRC reviewNrr nrc T1 - Beyond Earth: The Future of Nuclear Technology in Space | Video

submitted a request for a one-time exception to Nuclear Reactor Regulation (NRR) Office Instructions (OIs) LIC-109, “Acceptance Review Procedures,” LIC-101, “License Amendment Review Procedures,” and LIC-500, “Topical Report Process,” acceptance review criteria for Vogtle Electric Generating Plant (Vogtle), Units 1 and 2. : NRC-419 Pages 1-382. Nuclear Regulatory Commission (NRC), United States. The test reactor would provide operational data toUse the information in this Telephone Directory only for authorized government purposes. gov tracy. Mr. Project No. The NRC staff cautioned that if TSTF-592 is not approved when the amendment is submitted, it will take more time to review the amendment. S. (NRR) / REG-106 (NRO) ML20055E096, "Title 10 of. Nuclear Regulatory Commission (NRC) Standards Forum. The difference between NRR and GRR is that GRR doesn’t account for. gov . The NRC u nderstands Kairos plans to file the second portion of the Hermes application, anNRC 本部(メリーランド州ロックビル). Nuclear Regulatory Commission, Washington, DC 20555, Attention: Reproduction and Distribution Services Section, or by fax to (301) 415-group. Participants included representatives of the NRC’s Office of Nuclear Reactor Regulation (NRR); Region III applicable NRR, NRC, and Government-wide standards, policies, laws, and regulations. Phone, 301-415-4737 or 800-397-4209. Office of Nuclear Reactor Regulation FROM: Margaret W. Nuclear Regulatory Commission (NRC) staff held an information meeting with a question-and-answer session with stakeholders to discuss advanced reactor. integrated schedule forecast dates exceeding nrc commitment dates mod unit mod description nrc apr cat 1990 may 1990 this mo nrc date days slip feb 90 -behind explanation + 4 + +-— + + + 550 3 normal ctmt clrs cntrl switches 569 4 normal ctmt clrs cntrl switches 787 c install barriers in hvac ducts i8,e 19apr90 31may90-42 19may90-12 fire doors to be. PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). 5 The NRR issued a memorandum on May 28, 2020, entitled, “Inspection Guidance During Transition From COVID-19 Mandatory Telework. • Provides. Benney 301-415-2767 Brian. The industry’s slide presentation,. S. A. Nuclear Regulatory Commission’s (NRC’s) Office of Nuclear Reactor Regulation (NRR) to develop office instructions (OIs) for the staff’s review of licensing applications submitted under Title 10 of the Code of Federal Regulations (10 CFR) Parts 50, 51, 52, and 54 that involve two or more NRR divisions or other NRC Brian W. A. To calculate NRR, deduct your revenue churn (contract expirations. gov. Stinson, NRR F. Docket Nos. Washington, DC 20555-0001 . -'SUBJECT: Responds to NRC 980618 ltr re violations noted in insp rept 50-397/98-10. A Noise Reduction Coefficient – commonly known as NRC – is a single number rating which represents the average of sound Absorption Coefficients of a material at specific mid-range frequencies (tested at 250, 500, 1,000, and 2,000 Hz octaves). 50-390/93-65 AND 50-391/93-65 This refers to the NRC inspection conducted by G. To access information on the agency's rules, see "Rules" [email protected]. gov * Commission's Policy Statement on “Enhancing Public Participation in NRC Meetings," (67 FR 36920), May 28, 2002 ADAMS ACCESSION NO. NRR Deputy Office Director for New Reactors Robert Taylor. Based on anticipated interactions with the NRC, and the potential need for additional refinements to NEI 21-07, Rev 0, NEI intends to provide Revision 1 to this document before formally requesting NRC review and endorsement. PERFORMANCE MEASURESOffice of Nuclear Reactor Regulation . : 99902071 . cc: X-Energy Xe-100 . The general purpose of this office instruction is to provide guidance to staff in the Office of Nuclear Reactor Regulation (NRR) and the staff in other NRC offices supporting NRR for the processing of license amendment applications consistent with the applicable NRC regulatory requirements. 2 Office of Nuclear Reactor Regulation SUBJECT NRR OFFICE INSTRUCTIONS In carrying out our FY2002 new initiative to improve office infrastructure, the first three NRR Office Instructions were issued in September 2000 and defined (1) the overall program, (2) the transition plan to implement the program, and (3) the requirements for developing and clp@nrc. If you need a reasonabie accommodation to participate in a meeting, or need a meeting noticenrr/de/ecgb/a nrr/drch/hicb nrr/dssa/srxb ogc/hds3 external: noac t nrr/de/emcb nrr/dssa/splb nudocs-abstract nrc pdr d e n note to all "rids" recipients: please help us to reduce waste. Research and test reactors comprise one of four sub-arenas that the staff of the U. The main points of discussion during the meeting included: For slide 5, the NRC staff asked about BWXT’s experience with tri-structural isotropic As a result, the NRC staff has concluded that supplemental information on this topic is required before the NRC staff could accept the SDA application for docketing and conduct a detailed technical review of all aspects of the application. If the constant noise measured in the tour environment is 90 dB(A), the actual exposure by someone wearing noise reduction headphones with an NRR of 25 dB is. Zinke, et al. Dean, OEDO J. OFFICE OF NUCLEAR REACTOR REGULATION LIC-111, Revision 1 Regulatory Audits Volume 100 Licensing Processes Approved By: Eric J. Resident Inspector (Mail Drop 927N, 2 Copies) INPO Records Center -Atlanta, GA. Nuclear Regulatory Commission, Washington, DC 20555–0001. Nuclear Regulatory. H • Vo 11 mer T. SUBJECT: NRC INSPECTION REPORT NOS. Office of Nuclear Reactor Regulation SUBJECT: SUMMARY OF JANUARY 21, 2021, ADVANCED REACTOR STAKEHOLDER PUBLIC MEETING On January 21, 2021, the U. Office of Nuclear Reactor Regulation . S. Enables NRR to operate efficiently and effectively by overseeing administrative services, human capital management, information. It is the policy of the Office of Nuclear Reactor Regulation (NRR) to address questions raised by other Nuclear Regulatory Commission (NRC) organizations in a timely manner with a. Please describe the nature of your responsibilities on behalf of the NRC. NRC Nuclear Regulatory Commission NRR Office of Nuclear Reactor Regulation (NRC) NBSR National Bureau of Standards Reactor OL operating license PIC pocket ion chamber PRA probabilistic risk assessment RCS reactor coolant system REM Roentgen Equivalent Man RG regulatory guide (NRC). Gross revenue retention defined. gov. Office of Nuclear Reactor Regulation NRR OFFICE INSTRUCTION NRO OFFICE INSTRUCTION Change Notice Office Instruction No. Office NRR/DORL/LPL2-1/PM NRR/DORL/LPL2-1/LA NRR/DORL/LPL2-1/BC NRR/DORL/LPL2-1/PM Name GEMiller KGoldstein MMarkley GEMiller Date 11/21/2023. The OIG assessed whether the NRC has established and implemented an effective. gov. Chawla@nrc. Joseph M. Vasavada@nrc. IRA! Plant Licensing Branch 11-2. michael. gov Jason J. gov Responsible Organization: NRR/DRA Summary of Changes: This is Revision 4 of LIC-504, “Integrated Risk-Informed Decision-Making Process for Emergent Issues. Quichocho C. gov Ross Telson 301-415-2256 rdt@nrc. Andrea Veil, Director, Office of Nuclear Reactor Regulation, NRC; Meet the Moment—Remarks. Mike King. The inspection included a review of activities authorized for your Browns Ferry facility. Mid-cycle inspection planning letters are located at the 20YY005 hyperlinks. Guey P. Plant. Beaver Valley Power Station, Unit 1, Updated Final Safety Analysis Report, Revision [email protected] of Nuclear Reactor Regulation SUBJECT: NRR OFFICE LETTER NO. Scott Wall, NRR 301-415-2855 scott. Fax, 301-415-3548. The Nuclear Regulatory Commission (NRC) Office of Nuclear Reactor Regulation (NRR) has the responsibility of overseeing all university research reactors (URRs) including the MITR. S. POLICY The Office of Nuclear Reactor Regulation (NRR) can grant relief from, authorize alternatives to, or approve the use of later editions and addenda of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (BPV) Code requirements NRR Office Instruction LIC-500, Revision 8 Page 4 of 4 • Technical staff conduct the TR reviews and determine if the TR is acceptable for use; and • Licensing Assistants in DORL will ensure that staff documents are consistent with the NRC writing and style guidance in the “NRC Editorial Style [email protected]@nrc. : April 4, 2005 Primary Contacts: John Harves Cynthia Dekle 301-415-2252 301-415-3282 jch2@nrc. The NRC will hold a public meeting to promote a full understanding of the planned rulemaking and facilitate public comment on the regulatory basis. The purpose of 10 CFR Part 51, “Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions,” is to ensure that Staff from the Office of Nuclear Reactor Regulation (NRR) issues a request for additional information (RAI), when necessary, to support reasonable assurance findings on the safety of a design, operation, or siting, as well as environmental issues, in accordance with the Nuclear Regulatory Commission (NRC) rules and regulations. Created Date:Ray Furstenau, Director, Office of Nuclear Regulatory Research, NRC; Perspectives from The Honorable Jeff Baran. You may also contact an expert. NRC-001 OFFICE NRR/DANU/UAL1:PM NRR/DANU/UAL1:PM NRR/DANU/UAL1:BC NRR/DANU/UAL1:PM NAME CBanks MSutton WJessup MSutton DATE 8/14/2023. The U. 3 (NRR) / REG-112, R. Andrea Veil, NRR, NRC 877. gov Nick. Harbuck, NRR C. Office of Nuclear Reactor Regulation NRR OFFICE INSTRUCTION Change Notice Office Instruction No. S. Telephone: 301-415-7554. Nuclear Regulatory Commission (NRC) will use sound science and state-of-the-art Director (A):Evan Davidson Provides mission and program support to the Office of Nuclear Reactor Regulation (NRR) and the Operating Reactor and New Reactor Business Lines. Most public documents may be reproduced on CD–ROM, microfiche, or paper for a nominal fee. Take the NRR of 33 and derate it with the following formula: (NRR - 7) / 2. Dudes, NRR J. Nuclear Regulatory Commission (NRC) held a Category 2 public meeting with industry stakeholders, including the Nuclear Energy Institute (NEI) and the U. John Segala NRC/NRR/DANU/UARP Cyril Draffin US Nuclear Industry Council Maryam Khan NRC/NRR/DANU/UARP Denis Henneke GE Hitachi Eric Oesterle NRC/NRR/DANU/UARP Steven Nesbit LMNT Consulting Arlon Costa NRC/NRR/DANU/UARP Frank Akstulewicz A to Z Reactor Consulting Services Juan. NRC . The U. A. A. Hardies, NRR/DCI, NRC NEI Buried Piping Integrity Working GroupDocket Nos. . Monthly Reports to Congress. Office of Nuclear Reactor Regulation . gov Jason. The United States Nuclear Regulatory Commission (NRC). gov NRR InfoReview Group A designated group of NRR staff who are responsible for conducting sensitivity Reactor Oversight Process (ROP) The Reactor Oversight Process is the U. See moreProvides leadership; plans, recommends, manages and implements programs of nuclear regulatory research; and interfaces with all NRC offices and the. gov Enclosure: Figures 1 and 2 Office of Nuclear Reactor Regulation NRC’s Mission • To license and regulate the nation's civilian use of nuclear materials in order to ensureuse of nuclear materials in order to ensure the adequate protection of public health and safety, promote the common defense and security, and to protect the environment. Additional It is the policy of the Office of Nuclear Reactor Regulation (NRR) to provide guidance for its staff to meet the requirements and performance goals established in legislation, regulations, the Agency’s strategic plan, and office-level operating plans. The noise reduction coefficient (commonly abbreviated NRC) is a single number value ranging from 0. OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001 February 21, 2014 NRC INFORMATION NOTICE 2014-01: FUEL SAFETY LIMIT CALCULATION INPUTS WERE INCONSISTENT WITH NRC-APPROVED CORRELATION LIMIT VALUES ADDRESSEES All holders of an operating. Change Notice. To order a Motor with a Self-Release Coupling (SRC), add an “N” as the last character in the Catalog Number. 7), the NRC informed licensees that NEI 99-04 contains acceptable guidance for controlling regulatory commitments andThe U. and Westinghouse submitted presentation slides to the NRC (ML23271A159). S. Ray Furstenau, Director, Office of Nuclear Regulatory Research, NRC Remarks by Jeff Baran The Honorable Jeff Baran, Commissioner, NRC | Video | Transcript: 10:30 a. 59 Implementation at Non-Power Production or Utilization Facilities” Project Number: 689 . Office of. Oversees, manages, and directs the development and implementation of policies and programs for enforcement of NRC requirements. Helker . At the conclusio'n of the inspection, theThe NRC's REIRS system provides the latest available information on radiation exposure to the workforce at certain NRC licensed facilities. Net Retention rate (NRR) is a growth indicator that measures the performance of your business. 50-382 Enclosure: Agenda (ADAMS Accession No. The three main changes are: (1) review for “no legal objection” by the Office of the General Counsel NRR Office Instruction LIC-102, Revision 3 Page 2 of 11 1. Subtract that value from the environmental noise level: 100 - 13 = 87. GWaýto :vyg. T. 2 using an approach other than rulemaking. Reyes, NRC, Region II Mr. 2a. (202) 234-4433 WASHINGTON, [email protected] 301-415-8371 301-415-8556 Summary: This revision was updated to capture NRR and NRO best. Implements the requirements of this manual chapter within NRR. on the NRC’s assessment of licensee performance. In particular, the U. Monthly Reports to Congress. 02 Branch Chief, Technical Specifications Branch (DSS/NRR) 4 0326-06 OPERABILITY DETERMINATION PROCESS 4 06. The purpose of 10 CFR Part 51, “Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions,” is to ensure thatOFFICE OF NUCLEAR REACTOR REGULATION LIC-115, Revision 1 Processing Requests for Additional Information Volume 100 Licensing Processes Approved By: Michael I. Nuclear Regulatory Commission (NRC) staff hosted a public meeting with the Nuclear Energy Institute’s (NEI’s) Reactor Oversight. S. S. 50-387 and 50-388 LICENSEE: Pennsy'. Program management, inspection, and operator licensing are the three major oversight responsibilities of NRR. SUPPLEMENTARY INFORMATION: I. Division of Reactor Oversight . 109, 10 CFR 50. Implements the NRC inspection program for all operating reactor facilities in Region IV. The NRC’s Advanced Reactor Stakeholders Meeting – On December 12,. The National Railroad Construction and Maintenance Association – the “NRC” – is a U. I am a Financial Analyst in the Division of Inspection and Regional Support, NRR, at the NRC. Chernoff E. Nuclear Regulatory Commission (NRC) was created as an independent agency by Congress in 1974 to ensure the safe use of radioactive. S. The list of attendees is enclosed. It is NRR management’s expectation that license amendments be processed in a manner consistent with the NRC’s Principles of Good Regulation ([email protected]@nrc. orf@nrc. (NRC) staff conducted the meeting in accordance with NRC Management Directive 3. Lee@nrc. gov Anthony J. Office of Nuclear Reactor Regulation . ''. Project No. Dunning E. gov • Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920}, May 28, 2002. Lyons, NRR R. NUCLEAR REGULATORY COMMISSION PUBLIC MEETING WITH. Gross revenue retention defined. Muñiz joined the U. Peter. 206 Petition Submitted on September 17, 2023, as amended on November 4, 2023 (EPID L-2023-. NRC NEI R. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. Nuclear Regulatory Commission (NRC)'s program to inspect, measure, and assess the safety and security performance of operating commercial nuclear power plants, and to respond to any decline in their performance. S. Section 2. Mike King. Whitman, NRR, et al. Annual assessment letters are located at the 20YY006 hyperlinks. Brown, et al. NRC staff held public meetings with Oklo on September 1, 16, and 28, 2021 (meeting summaries available at ADAMS Accession Nos. 50-255. tlw4@nrc. It also contains information concerning the recording and reporting requirements of NRC licensees. GRR calculates total revenue (excluding expansion) minus revenue churn (contract expirations, cancelations, or downgrades). 02 Presumption of Operability 4 06. The information Office of Nuclear Reactor Regulation FROM: Marieliz Johnson, Project Manager /RA/ Licensing Renewal Projects Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation SUBJECT: U. Dear Mr. S. Nuclear Regulatory Commission. Estimated exposure (only earmuffs) = 100 dBA – (31 – 7) x 0. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. NRR will consider an RLA to be acceptable for review upon the NRC staff’s conclusion that the application reasonably appears to contain sufficient technical information, both in scope and depth, for the NRC staff to complete the detailed technical review and Nuclear Reactor Regulation (NRR), for the processing of license amendment applications consistent with the applicable NRC regulatory requirements. Provides oversight across agency lines of authority for all NRC policies and activities related to reactor safety and homeland protection and. : 50-272 and 50-311 Enclosure: List of Attendees CONTACT: James Kim, NRR/DORLThis memorandum documents the U. org. 01 Continuous Assessment of Operability 4 06. To the right is an example of the EPA label for a headset with an NRR of 33 dB. Enclosure LIST OF ATTENDEESDocuments issued prior to October 1999 are available in paper or microfiche. If you have any questions about this letter, please contact the appropriate NRR project manager. Production and Utilization Facilities . Nuclear Regulatory Commission (NRC) staff and representatives of Abilene. , to David Mathews, Director, NRR, and Marvin Mendonca, Senior Project Manager, NRR, NRC, Divestiture Plan Regarding Indirect Transfer of the Aerotest Radiography and Research Reactor (ARRR) (Jan. Sebrosky, NRR Project No. Dennis Galvin, Office of Nuclear Reactor Regulation, U. A statement of my professional qualifications is attached as Exhibit NRC-005. Develops assessment program policies and procedures. Nuclear Regulatory Commission . The Office of Nuclear Reactor Regulation (NRR) has completed its actions supporting closure of Generic Issue (GI)-186, “Potential Risk and Consequences of Heavy Load Drops in Nuclear Power Plants. Kowalewski K. · '. Generic Communications are available for electronic distribution and can be obtained by subscribing to the list server. The team must follow the policy, standards, and procedures in Management Directive 3. Veil joined the NRC in 1992 as an intern and has held a wide range of key management and leadership positions, including Deputy Office Director, Office of Nuclear Regulatory Research; and NRR Deputy Office Director for Engineering. AdditionalIt is the policy of the Office of Nuclear Reactor Regulation (NRR) to provide guidance for its staff to meet the requirements and performance goals established in legislation, regulations, the Agency’s strategic plan, and office-level operating plans. gov Note: NRC generic communications may be found on the NRC public Web site,NRC Facebook NRC Twitter Feed NRC Linkedin NRC Youtube Channel NRC Flickr Gallery NRC Blog Archived NRC Email Subscriptions - GovDelivery. ENCLOSURESUBJECT: NRC INSPECTION REPORT NOS. Stohr@nrc. Kingsley: SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS. A. gov John Tsao, NRR Thomas Scarbrough, NRR 301-415-2702 301-415-2794 John. 2 Joseph Ashcraft NRC/NRR/DEX/EICB Grace Kim NRC/OGC Susan Vrahoretis NRC/OGC Anthony Rossi NRC/OCFO/DOB/LFPT David D'Abate NRC/OCFO/DOC Jawanza Gibbs-Nicholson NRC/OCFO/DOC/LAFBB/FBT Derek Widmayer NRC/ACRS Tony Nakanishi NRC/COMM/OCM Robert Krsek. Kingsley, Jr. Learn more about the NRC's mission, vision, and values, and how they work. Slides ML21237A463 NRC-001 OFFICE. OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D. Coyne, NRR C. S. S. The U. TVA J. They also focus on compliance activities, and complement NUREG-0933, "Resolution of Generic Safety Issues. The group’s primary goal is to remove barriers to innovation and launch initiatives that improve the way we work to make SAFE use of nuclear technology POSSIBLE and encourage the staff to make real change. Kuo J. It is the policy of the U. Anderson, Vice President for Legal Affairs and General Counsel, Autoliv, Inc. Peter. 720 Attachment: Agenda cc w/att: See next page CONTACT: Stephen. Shams: The Nuclear Energy Institute (NEI) 1Office of Nuclear Reactor Regulation NRR REVIEW STANDARD Change Notice Review Standard No. Nuclear Regulatory Commission (NRC) staff has completed an activity to assess the feasibility of extending the time period for license. SES . 50-7513, 50-611, 50-612 cc: Distribution via Gov Delivery ListServ Signed by. Taylor@nrc. S. gov. Nuclear Regulatory Commission (NRC) is issuing Revision 4 to Regulatory Guide (RG), 1. Provides direction and supervision of the resident inspection staff at each reactor facility. Smith currently serves as Director of the Division of New and Renewed Licenses (DNRL) in the Office of Nuclear Reactor Regulation (NRR). [email protected] NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1. SNC requests that the NRC staff accept for review planned requested licensing actions (RLAs) for Vogtle, Units 1 and 2, that would rely on two draft. Home Nuclear Reactors Operating Reactors Reactor Oversight Process (ROP) Plant Summaries - Quarterly Performance Summary. S. Nuclear Regulatory Commission. DATES: The group’s primary goal is to remove barriers to innovation and launch initiatives that improve the way we work to make SAFE use of nuclear technology POSSIBLE and encourage the staff to make real change. Nuclear Regulatory Commission (NRC) is proposing to amend its regulations to certify the NuScale standard design for a small modular reactor. 13). : LIC-400. R. Nuclear Regulatory Commission (NRC or the Commission) is holding a public meeting to discuss a draft regulatory issue summary (RIS) that. An NRR of less than 100% indicates contraction and that the company is on a less-stable footing. Office of Nuclear Reactor Regulation August 25, 1995 FROM: SUBJECT:. gov Responsible Organizations: NRR/DIRS/IOEB and NRO/DCIP/CAEB Summary of Changes: This revision of LIC-401. gov 301-415-7038 301-415-3168 Summary: This is the initial issuance of LIC-115, which consolidates guidance from NRO. Learn more about the NRC's mission, vision, and values, and how they work. Sheron T. : RS-002 Review Standard Title: Processing Applications for Early Site Permits Effective Date: Primary Contacts: Michael Scott 301-415-1421 mls3@nrc. A statement of my professional qualifications is attached as Exhibit NRC-004. ” 6. D. Nuclear Regulatory Commission (NRC) Agencywide Steve Lynch NRC/NRR/DANU/UNPL. 206 Petition Submitted on September 17, 2023, as amended on November 4, 2023 (EPID L-2023-. Mohammed Shams, NRR, NRC . :. Exhibitor: Taylor Lamb, Technical Assistant, NRR/NRC, 301-415-7128, Taylor. Title: Letter from NEI transmitting NEI 21-07, Revision 0, Technology Inclusive Guidance for Non-Light Water Reactors Safety Analysis Report Content for Applicants Utilizing NEI 18-04 Methodology Project NumberIt is the policy of the Office of Nuclear Reactor Regulation (NRR) to employ the strategies in NUREG-1614, Volume 8, “Strategic Plan: Fiscal Years 2022–2026,” issued October 2013 (Ref. 20555-0001 February 28, 2008 NRC REGULATORY ISSUE SUMMARY 2008-04 DISCONTINUATION OF TWO PERFORMANCE INDICATORS ASSOCIATED WITH THE SECURITY REACTOR OVERSIGHT PROCESS ADDRESSEES All holders of operating licenses for nuclear. ~10fYL. The office should not be confused with the NRC's Nuclear Regulatory Research. Ward@nrc. Nuclear Regulatory Commission (NRC) regulations. S. / RA / David B. Matthews, Director Division of Regulatory Improvement ProgramsOffice of Nuclear Reactor Regulation Technical Contacts: Ronald Nimitz, Region I Stephen Klementowicz, NRR (610) 337-5267 (301) 415-1084 E-mail: rln@nrc. The FSARG is an advisory group comprised of NRC staff from various offices including the Office of Nuclear Reactor Regulation (NRR), Office of Nuclear Material Safety and Safeguards (NMSS), and Re-gion II. Nuclear Reactor Regulation (NRR) NRC C. . Andrea Veil joined the U. In accordance with the 1988 amendment to the Act, the NRC Office of the Inspector General (OIG) was established on April 15, 1989, as an independent and objective Office to. Walton on June 1 through June 30, 1993. [email protected], Revision 1, “Calculation of Annual Doses to Man from. guzman@nrc. gov * Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings @ (67 FR 36920), May 28, 2002 Distribution: PUBLIC LPL3-1 R/F RidsNrrPMJCushing RidsNrrAdro RidsNrrDorl RidsOpaMailCenter AHiser, NRR. An NRC of 0. It is the policy of the NRC’s Office of Nuclear Reactor Regulation (NRR) to establish procedures and guidance for its staff to meet the requirements established by applicable statute and regulation. The. 2000s: | 2005 | 2004 | 2003 | 2002 | 2001 | 2000 |. gov Responsible Organization: NRR/DRA Summary of Changes: This is Revision 4 of LIC-504, “Integrated Risk-Informed Decision-Making Process for Emergent Issues. Richard V. It is the policy of the Office of Nuclear Reactor Regulation (NRR) to address questions raised by other Nuclear Regulatory Commission (NRC) organizations in a timely manner with a level of effort commensurate with the significance 1 of the underlying issue. Enclosure: As stated . gov Timothy. S. NRC after the business portion, but before the meeting is adjourned. A reverberation chamber is used to test the sound absorption coefficients and NRC of a material. gov. Subject: Supplementary Response to Req uest for Additional Information Regarding EPRI Report 1022909, “Benchmarks for Quantifying Fuel Reactivity Depletion Uncertainty” Project Number: 689 . 50-259/90-32, 50-260/90-32, AND 50-296/90-32 This refers to the inspection conducted by N. gov 301-415-4083 301-415-5342 Summary: This revision reflects the reunification of NRR and NRO and makes other. SUPPORT THE WESTINGHOUSE-NRC PRE-SUBMITTAL MEETING ON THE WESTINGHOUSE AP300™ SMR DESIGN DESCRIPTION OVERVIEW WHITE PAPER” DATED: NOVEMBER 13, 2023 DISTRIBUTION: PUBLIC NRR/DNRL/NLIB R/F RidsOgcMailCenter Resource MHayes, NLIB RChristian, WEC WGleaves SGreen. NRC public Web page regarding COVID-19 Regulatory Activities for Nuclear Reactors. NRR Deputy Office Director for New Reactors Robert Taylor. Roth, NRR D. Resident Inspector -927N 9707i50329 970703 PDR 'DOCK 05000397 P PDR DLWilliams -BPA/399 CR Wallis -EFSEC PD Robinson . Karwoski K. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft Regulatory Guide (DG), DG-1415, ``Dedication of Commercial-Grade. NRC NEI Tim Frye Ralph AndersenNRR Office Instruction LIC-208 Page 4 of 22 . FROM: Edward Helvenston, Project Manager /RA/ Non-Power Production and Utilization Facility LicensingBranch . Independently proposes improvements to the agency's regulatory research programs and processes to enhance safety, efficiency, and/or effectiveness based on research. Douglas. Additionally, ARC also requested responses to three specific questions that were posed to the NRC staff during a May 3, 2023, clarification call regarding the WP. Washington Operations 12300 Twinbrook Pkwy. The Nuclear Regulatory Commission ( NRC) is an independent agency of the United States government tasked with protecting public health and safety related to nuclear energy. Robert Taylor. Dean, NRR G. Mohamed K. : LIC-205, Revision 5 Office Instruction Title: Procedures for NRC’s Independent Analysis of Decommissioning Funding Assurance for Operating Nuclear Power Reactors Effective Date: Approved By: Approved Date: Primary Contacts: January 16, 2015Commission (NRC) has issued an exemption in response to an April 13, 2023, request, as supplemented. The NRC staff’s feedback and observations are provided in the enclosure to this letter. Fuel Cycle Safety, Safeguards, and Environmental Reviews. Congress passed the Inspector General (IG) Act of 1978 to ensure integrity and efficiency within the Federal government and its programs. 50-259, 50-260, and 50-296 License Nos. Zoulis 301-415-1209. Indeed, the NRR concluded that the change in core damage frequency risk due to the potential CSFI-caused failure of a safety-related SSC was less than one in 10,000 per year for the most likely type of components that the NRC Staff inferred would be impacted in the OIG's report. Discussions will be led by NRC contractors. Docket [email protected] of Nuclear Reactor Regulation SUBJECT: SUMMARY OF MAY 18, 2020, CLOSED MEETING WITH THE. Copeland@nrc. responsibilities and authorities for the Office of Nuclear Reactor Regulation (NRR) staff to resolve backfit issues and to issue 10 CFR 50. If you are unable to locate an expert, please contact our Office of Public Affairs. Implements the NRC inspection program for all operating reactor facilities in Region IV. Docket No. Performs inspections and technical evaluations in the specialized fields. Office of Nuclear Reactor Regulation FROM: James Kim, Project Manager /RA/ Plant Licensing Branch I Division of Operating Reactor Licensing. Office of Nuclear Reactor Regulation . NRC/Document Control Desk,NRC/NRR. Holland, Project Manager, Section 2 /RA/ Project Directorate IV. P. Because the NRC's fee recovery under the IOAA (10 CFR part 170) will not equal 100 percent of the agency's total budget authority for the fiscal year (less the budget authority for excluded activities), the NRC also assesses “annual fees” under 10 CFR part 171, “Annual Fees for Reactor Licenses and Fuel Cycle Licenses and Materials. S. S. salNRC Industry J. This is a meeting in which attendees will have an. Nuclear Regulatory Commission (NRC) staff held a Category 3 public meeting with Nuclear Energy Institute (NEI), Industry, and Electric Power Research. Office of Nuclear Reactor Regulation, telephone: 301–415–1455, email: Carla. m. Brian. S.